This is a "3D" version of
the image above. The left hand part of the image shows the floor
slabs. The Right hand side is a poured concrete slab. The
project was to explain why the floor slab was settling. This showed
that the construction in the two areas was quite different and this
explained the reason for the differential settlement

|